Solar One
Craighead Electric Cooperative partnered with Today’s Power, Inc. (TPI) and the City of Brookland in 2018 to build a 1-megawatt solar array in Brookland, AR.
Craighead Electric Cooperative partnered with Today’s Power, Inc. (TPI) and the City of Brookland in 2018 to build a 1-megawatt solar array in Brookland, AR.